Labels:grass | hakham | person | sky | stairs OCR: Pre-molded bell footings Overview Applications for below grade: (continue) History of footings Development of ithe For below grade applications simply attach the footing Bell Footing form to the construction tube with minimum of four Pre-molded bell screws place n the groundj on of undisturbed soil or footings compacted crushed stone or gravel, level. Review plumb and backfill. Use the footing form turned upside References down funnel for pouring concrete into the tubes TEST As is typical with all foundations of amy kind, consultation with a qualified structural engineer is. recommended PREY 49 NEXT> tootnas PREV